At the end of July 1958 the superstructure was ready up to the level of the Sundeck. The anchor machinery is being placed and the breakwater is ready. Work is being done on the top of the shafts to the two forward holds.

The second picture shows the temporarily roof over the Promenadedeck, to prepare for the laying of the teak deck on what is now the Lidodeck. The aft end of the Upper-Promenadedeck, Boatdeck and Sundeck can clearly be seen.